All sample projects
Request an Estimate
Sample project — illustrative work, not a client job
Millbrook Farmhouse
- Service
- New construction
- Location
- Millbrook (sample location)
- Finish
- Charcoal, low-gloss finish

Because the roof was planned before framing closed in, the builder left the right rafter tails and fascia detail for a clean eave line, and we ran the panels the full length of each slope without a single mid-panel lap.
Coordinating with the builder's schedule also meant the interior stayed dry through the winter — the roof was watertight before drywall went in.
Scope of the sample project
- Roof layout planned with the builder before close-in
- Full-length panels, no mid-slope laps
- Hidden fastener eave detail designed with the framer
- Low-gloss charcoal finish selected from physical samples
- Watertight before interior finishing began